Solutions
Synopps software: one engine, three modules for master data tasks
Academy
Master data training built on real project practice
Maintenance master data for EAM · SAP PM, IBM Maximo
We build the equipment master data your maintenance system runs on: the asset hierarchy, equipment data sheets, criticality and FMEA, maintenance task lists and clean spare parts data, ready for SAP PM, IBM Maximo and other EAM systems.
Example: 7-level equipment hierarchy
GRGR-1000GR-1100GR-1120GR-1120-AFE-001GR-1120-AFE-001-DVS1914632What we do
Good master data is the foundation of an EAM system. It lets maintenance move from reactive repairs to planned and predictive work.
One equipment register with a logical structure, for example plant, area, line, pump, motor.
FMEA for critical equipment: every possible failure mode, such as a pump leak or motor overheating.
Standardised attributes for every piece of equipment.
Clean reference data for the EAM system.
Each task list includes:
Data synchronised between EAM (SAP PM, IBM Maximo) and ERP (SAP ECC, Oracle and others).
Approach
One equipment classification with unique codes, standard work types and spare parts without duplicates.
The equipment hierarchy, functional links such as "pump A is driven by motor B", and which work is done how often.
Equipment criticality by the consequences of failure, with FMEA for critical items.
Condition-based, time-based or predictive maintenance for each class of equipment, using RCM and FMEA.
Track record
Task
What we did
Task
What we did
Task
What we did
FAQ
SAP PM, IBM Maximo and other EAM and ERP systems. The data structure and load templates follow the target system.
We usually build the equipment classification on ISO 14224 and adapt it to your assets. The number of hierarchy levels is agreed at the assessment stage.
Equipment master data describes the equipment itself: hierarchy, data sheets, criticality. Inventory optimisation decides which spare parts to hold and in what quantity. Equipment criticality helps to assess the criticality of its spare parts.
Yes. Duplicate spare parts are found and merged as part of the project, or as a separate master data cleansing project.
Contact
Tell us about your assets, your EAM system and the state of your equipment data. We will propose the first steps.
What you have now and what you need
Data, processes and IT landscape
Stages, timeline and scope