Solutions
Synopps software: one engine, three modules for master data tasks
Academy
Master data training built on real project practice
Synopps calculates the reorder point, safety stock and order quantity from consumption history and lead time, tests the proposal on last year next to the current ERP settings and runs the change through a request. Only what the approver signs off reaches the ERP.
Synopps MRP is a tool for calculating and changing replenishment parameters: the reorder point (min), the maximum level (max), safety stock and order quantity for every item at every site. It works from 24–36 months of consumption history, the lead time and its variability, and the target service level that the policy sets for each criticality. Every proposal is tested on last year next to the current ERP settings and changed through a request with approval. Items the formula does not fit are not calculated; the tool sends them for review.
The planner does not recalculate a group in Excel, and the manager does not have to take it on trust: every number shows its breakdown and its impact on last year.
Safety stock comes from demand variability and lead time variability. The reorder point is demand over the lead time plus safety stock.
The same monthly consumption runs through the ERP min/max and through the proposal. You see the service level, average stock and its value.
The planner sends the proposal with a rationale, and the approver approves, returns or rejects it. The history stays: before, after, who and why.
The pilot model is continuous review: when stock plus open orders falls to the reorder point, one order quantity is ordered. The example figures are for demonstration.
Amounts in US dollars. Your data will give its own figures; a pilot starts with exactly this check.
Usually the formula is not the problem: the parameters were set once and since then changed by hand, without a check.
A one-off inventory optimization project gives the right parameters as of the report date. The tool keeps them right after that: every next change is calculated, tested and approved the same way.
There is no check before the change. Only one person knows why a figure is what it is.
The impact is visible before the change. The decision and its basis stay in the request.
The exchange with your ERP (SAP or another system) is set up during the project for your landscape.
The planner opens an item and finds the proposal already calculated and tested. What is left is to decide whether they agree with it and, if needed, adjust the assumptions.
Min splits into demand over the lead time and safety stock, max into safety stock and order quantity. You see where every unit comes from.
Service level, lead time, order quantity and the expected change in demand move on sliders. Min and max recalculate at once.
One person prepares and sends, another approves. Returns and rejections come with a reason, and the whole exchange stays in the request.
From consumption history, the lead time with its variability and the service level the policy sets for this criticality. A missing month is not counted as zero: the calculation waits for data.
The same monthly consumption runs through the current min/max and through the proposal. Both start from the same stock, and unmet demand counts as lost. Service level, average stock and its value are compared, and the backtest assumptions are shown next to the result.
If the planner knows more than the history does (a new supplier, consumption about to grow), they adjust the assumptions. The changed values go into the request with a reason, and the original calculation is kept alongside.
The request goes to the approver with the calculation, the backtest and a comment. If the data or policy changed in the meantime, an outdated request cannot be sent: it is recalculated first.
Approve, return for rework or reject. Returns and rejections need a reason. Each item has one open request; closed ones build up in the history.
Min becomes the reorder point, max the sum of safety stock and order quantity. The values are written to the item's min/max fields, where the ERP picks them up, with the history: before, after, who, when and under which request.
The demo goes through these steps on one item. Its sliders are real: min and max recalculate with the same formula as in the product.
The tool proposes, the approver decides. Without approval, min and max in the ERP do not change.
Every number shows its breakdown, every test shows its assumptions. Never just “the model said so”.
A missing month is not replaced with zero, and rare consumption is not quietly pushed through the formula. Such items go for review.
A calculation is stored with the policy and data version, a request with every round and comment. A new calculation does not overwrite an accepted decision.
An item's class depends on its criticality and on how many months of the last year it had consumption. The class decides whether the tool calculates min/max itself.
| Months with consumption | High | Medium | Low |
|---|---|---|---|
| 4 or more | A | A | B |
| 1–3 | A | B | C |
| 0 | A* | C | C |
Rows are months with consumption in the last year, columns are item criticality. The matrix and service levels are set by the project policy.
In: consumption history, lead times, prices and the current min/max. Out: approved values in the item fields.
SAP or another ERP. The exchange is set up for your landscape during the project; until approval, the current ERP settings are only read.
The target service level for each criticality is set by a policy template. The policy is versioned, and every calculation records the version it used.
When installed on your side, consumption history and prices never leave your network.
The items are the same as in the Synopps material master. If one part is created three times, its consumption is split across three records, so the duplicate search runs before the calculation.
A short, honest list. It saves time in the very first conversation.
We start with a site and a group of items where the result is visible, and with a backtest on last year.
Two to three years of consumption history, lead times, prices and the current min/max for one site. We show the calculation and the backtest on last year.
The site, item groups, service levels by criticality, who approves and what counts as a result.
Connection to the ERP, calculation for every item at the site, the first requests go through approval, and approved values go to the ERP.
The formula is similar; the difference is everything around it. Every item is calculated the same way, every proposal is tested on last year, and every change goes through approval and stays in the history. One planner's spreadsheet gives none of that.
Monthly consumption by item and site for 24–36 months, the average lead time and its variability, the unit price, criticality and the current min/max from the ERP. For a pilot, an export for one site is enough.
By the project policy: each criticality has its own target level. In a request it can be changed for a specific item, and the approver sees that change together with the reason.
They are not quietly pushed through the formula. Non-critical items with rare consumption go on request, and critical insurance spares with no consumption go to a specialist for review. The tool shows why an item was not calculated.
It is a scenario: the same monthly consumption, the same starting stock, a fixed lead time, and unmet demand is lost. It compares two policies fairly on the same data, but it does not emulate every ERP setting. The assumptions are shown next to the result.
Whoever you appoint: the planning manager, the warehouse manager or a master data expert. Rights to prepare and to decide are granted separately, and only a person makes the decision.
Yes. The exchange is set up during the project, so the ERP can be any: SAP or another system. Until approval, the current ERP settings are only read.
Not necessarily, but duplicates get in the way: if one part is created three times, its consumption is split between records and the calculation comes out too low. So in a pilot we look at duplicates too, and we do cleansing as well.
A project reviews the stock once and gives the parameters as of the report date. The tool stays with you and keeps the parameters current: every next change is calculated, tested and approved the same way. The two are often done together.
Tell us about your warehouse and how min/max are set today. We will calculate one site and look at last year together.