Synopps MRP · platform module

Inventory parameter software: min/max for every item, a backtest on history and approval

Synopps calculates the reorder point, safety stock and order quantity from consumption history and lead time, tests the proposal on last year next to the current ERP settings and runs the change through a request. Only what the approver signs off reaches the ERP.

  • Spare parts and MRO
  • Every item at every site
  • Impact visible before the change
  • Changes only through approval
One platform,
four modules
What it is

Synopps MRP is a tool for calculating and changing replenishment parameters: the reorder point (min), the maximum level (max), safety stock and order quantity for every item at every site. It works from 24–36 months of consumption history, the lead time and its variability, and the target service level that the policy sets for each criticality. Every proposal is tested on last year next to the current ERP settings and changed through a request with approval. Items the formula does not fit are not calculated; the tool sends them for review.

Parameters you can explain and test before the change

The planner does not recalculate a group in Excel, and the manager does not have to take it on trust: every number shows its breakdown and its impact on last year.

01 · calculation

For every item, not by group

Safety stock comes from demand variability and lead time variability. The reorder point is demand over the lead time plus safety stock.

02 · backtest

On last year, next to the current settings

The same monthly consumption runs through the ERP min/max and through the proposal. You see the service level, average stock and its value.

03 · request

Changes only through approval

The planner sends the proposal with a rationale, and the approver approves, returns or rejects it. The history stays: before, after, who and why.

Worked exampleitem 10005054 · pcs
Now in ERP
min4040
max112112
Proposal
min181331
max135467
04080120
  • Demand over lead time · 189 pcs a month × 2 months
  • Safety stock · 13z(95%) × √(LT × σ²demand + demand² × σ²LT) = 1.645 × √(2 × 4.5² + 9² × 0.5²) ≈ 13
  • Order quantity · 546 months of demand; can be set with the economic order quantity formula
  • min = demand over lead time + safety stockmax = safety stock + order quantity

The pilot model is continuous review: when stock plus open orders falls to the reorder point, one order quantity is ordered. The example figures are for demonstration.

144
items in the project
31
items with a proposal to change min/max
≈ $90K
potential working capital released on these items
$21K
on one item: min 40 → 31, max 112 → 67 at the same 98.2% service level on last year

Amounts in US dollars. Your data will give its own figures; a pilot starts with exactly this check.

What goes wrong

Too much in the warehouse, and the part you need is missing

Usually the formula is not the problem: the parameters were set once and since then changed by hand, without a check.

  • Min/max were set years ago and never revisited
    Demand and lead times changed, the parameters did not
  • One safety stock figure for a whole group
    Linked to neither demand variability nor criticality
  • Cash is tied up in stock, yet equipment stands idle for lack of parts
    Excess and shortage in the same warehouse
  • The recalculation lives in one planner's Excel
    Nobody else can check the formulas
  • There is no way to test a new calculation in advance
    It is unclear whether it gets better or shortages grow
  • The change goes into the ERP without a trace
    A year later nobody can say who set 112, or why
  • An insurance spare gets cut along with the rest
    Rare consumption does not mean the item is not needed

A one-off inventory optimization project gives the right parameters as of the report date. The tool keeps them right after that: every next change is calculated, tested and approved the same way.

Today and tomorrow

The check moves from after the change to before it

Today · manual A calculation in a spreadsheet, approval by email, and the impact shows only when the money is spent or a part has run out.
  1. 01
    Consumption is exported from the ERP to Excel
  2. 02
    The planner calculates with their own formulas
  3. 03
    New min/max values go by email
  4. 04
    The manager approves without seeing the impact
  5. 05
    The values are typed into the ERP by hand
  6. 06
    The reason for the change is recorded nowhere

There is no check before the change. Only one person knows why a figure is what it is.

With Synopps Calculation and testing follow the same rules for every item, the approver sees the impact, and the decision stays in the request.
  1. 01
    Consumption history and lead times come from the ERP
  2. 02
    Synopps calculates min/max for every item and site
  3. 03
    The proposal is tested on last year next to the current settings
  4. 04
    The approver sees the impact and decides
  5. 05
    Approved min/max values go to the ERP with their history

The impact is visible before the change. The decision and its basis stay in the request.

The exchange with your ERP (SAP or another system) is set up during the project for your landscape.

How a request works

A min/max change request: from calculation to the ERP update in one conversation

The planner opens an item and finds the proposal already calculated and tested. What is left is to decide whether they agree with it and, if needed, adjust the assumptions.

A number with its breakdown

Min splits into demand over the lead time and safety stock, max into safety stock and order quantity. You see where every unit comes from.

What-if before sending

Service level, lead time, order quantity and the expected change in demand move on sliders. Min and max recalculate at once.

Two keys

One person prepares and sends, another approves. Returns and rejections come with a reason, and the whole exchange stays in the request.

  1. 01

    Calculation

    in advance

    From consumption history, the lead time with its variability and the service level the policy sets for this criticality. A missing month is not counted as zero: the calculation waits for data.

  2. 02

    Backtest on last year

    in advance

    The same monthly consumption runs through the current min/max and through the proposal. Both start from the same stock, and unmet demand counts as lost. Service level, average stock and its value are compared, and the backtest assumptions are shown next to the result.

  3. 03

    What if

    optional

    If the planner knows more than the history does (a new supplier, consumption about to grow), they adjust the assumptions. The changed values go into the request with a reason, and the original calculation is kept alongside.

  4. 04

    Submit for approval

    your decision

    The request goes to the approver with the calculation, the backtest and a comment. If the data or policy changed in the meantime, an outdated request cannot be sent: it is recalculated first.

  5. 05

    Decision

    approver's decision

    Approve, return for rework or reject. Returns and rejections need a reason. Each item has one open request; closed ones build up in the history.

  6. 06

    ERP update

    after approval

    Min becomes the reorder point, max the sum of safety stock and order quantity. The values are written to the item's min/max fields, where the ERP picks them up, with the history: before, after, who, when and under which request.

The demo goes through these steps on one item. Its sliders are real: min and max recalculate with the same formula as in the product.

Four rules it is built on

A person always decides

The tool proposes, the approver decides. Without approval, min and max in the ERP do not change.

Everything is explainable

Every number shows its breakdown, every test shows its assumptions. Never just “the model said so”.

No data, no number

A missing month is not replaced with zero, and rare consumption is not quietly pushed through the formula. Such items go for review.

History cannot be changed

A calculation is stored with the policy and data version, a request with every round and comment. A new calculation does not overwrite an accepted decision.

Not every item should be calculated with a formula

An item's class depends on its criticality and on how many months of the last year it had consumption. The class decides whether the tool calculates min/max itself.

Months with consumptionHighMediumLow
4 or moreAAB
1–3ABC
0A*CC

Rows are months with consumption in the last year, columns are item criticality. The matrix and service levels are set by the project policy.

  • ACalculated min/max are calculated automatically if there is consumption in every month of the history window.
  • BThe item is explicitly set to be replenished automatically or On request.
  • COn request no stock is held, no min/max is set and the ERP fields do not change.
  • A*Needs review a critical insurance spare with no consumption: a specialist decides the stock level, and the tool does not make up a number.
  • Missing data months of history are missing, or there is no lead time or price.
Data and integrations

Takes data from the ERP and returns only what was approved

In: consumption history, lead times, prices and the current min/max. Out: approved values in the item fields.

ERP systems

SAP or another ERP. The exchange is set up for your landscape during the project; until approval, the current ERP settings are only read.

Policy by criticality

The target service level for each criticality is set by a policy template. The policy is versioned, and every calculation records the version it used.

In your environment or in the cloud

When installed on your side, consumption history and prices never leave your network.

The same material master

The items are the same as in the Synopps material master. If one part is created three times, its consumption is split across three records, so the duplicate search runs before the calculation.

What the tool does not do

A short, honest list. It saves time in the very first conversation.

  • It does not create purchase orders or replace procurement: it calculates the parameters, and the ERP places orders from them
  • It does not change min/max in the ERP without the approver's sign-off
  • It does not put zeros in place of missing months or make up stock levels for insurance spares
  • The backtest is a scenario with a monthly step, not an exact emulation of your ERP settings
  • It does not push intermittent demand through a normal distribution: such items go for review
  • Scheduled review of all items is still in development: today a request is opened item by item
How we start

A pilot at one site

We start with a site and a group of items where the result is visible, and with a backtest on last year.

  1. 01

    A conversation and a calculation on your export

    Two to three years of consumption history, lead times, prices and the current min/max for one site. We show the calculation and the backtest on last year.

  2. 02

    We agree the scope

    The site, item groups, service levels by criticality, who approves and what counts as a result.

  3. 03

    Pilot

    Connection to the ERP, calculation for every item at the site, the first requests go through approval, and approved values go to the ERP.

Questions people ask first

How is this different from a calculation in Excel?

The formula is similar; the difference is everything around it. Every item is calculated the same way, every proposal is tested on last year, and every change goes through approval and stays in the history. One planner's spreadsheet gives none of that.

What data is needed?

Monthly consumption by item and site for 24–36 months, the average lead time and its variability, the unit price, criticality and the current min/max from the ERP. For a pilot, an export for one site is enough.

How is the service level set?

By the project policy: each criticality has its own target level. In a request it can be changed for a specific item, and the approver sees that change together with the reason.

What about items with rare consumption?

They are not quietly pushed through the formula. Non-critical items with rare consumption go on request, and critical insurance spares with no consumption go to a specialist for review. The tool shows why an item was not calculated.

How far can the backtest be trusted?

It is a scenario: the same monthly consumption, the same starting stock, a fixed lead time, and unmet demand is lost. It compares two policies fairly on the same data, but it does not emulate every ERP setting. The assumptions are shown next to the result.

Who approves the changes?

Whoever you appoint: the planning manager, the warehouse manager or a master data expert. Rights to prepare and to decide are granted separately, and only a person makes the decision.

Does it work with SAP?

Yes. The exchange is set up during the project, so the ERP can be any: SAP or another system. Until approval, the current ERP settings are only read.

Do we need to clean the material master first?

Not necessarily, but duplicates get in the way: if one part is created three times, its consumption is split between records and the calculation comes out too low. So in a pilot we look at duplicates too, and we do cleansing as well.

How is this different from an inventory optimization project?

A project reviews the stock once and gives the parameters as of the report date. The tool stays with you and keeps the parameters current: every next change is calculated, tested and approved the same way. The two are often done together.

We will calculate and test it on your data

Tell us about your warehouse and how min/max are set today. We will calculate one site and look at last year together.

Discuss a pilot The form is below. We reply within one business day.
0
100000
We use your details to respond to your request. See our Privacy Policy.