Solutions
Synopps software: one engine, three modules for master data tasks
Academy
Master data training built on real project practice
Projects since 2017
Master data and MDM, cleansing, outsourcing, maintenance and inventory, process automation on SAP and other platforms. Each case covers the task, what we did and what the client got.
Our clients include

Pipeline operatorsince 2024
96,000
requests in 12 months
<1% overdue requests and errors
Contracts2024-252025-262026-27
Our experts work as part of the client's master data team: checking requests, searching for duplicates, approving and entering records.
SAP MDG

Mining and metals companysince 2022
27,400
requests in 2026
Contracts20222023202420252026
We process the queue of requests from the sites as material master experts: creating, changing, merging and blocking records. The contract is renewed every year.
SAP MDM

University with a national branch network2025-2026
ERP + MDM
head office and branches in one master data landscape
System roles and data flows, central master data maintenance for the head office and branches, related systems adapted and integrated through middleware.
Group ERPMDMMiddlewareActive Directory

Pharmaceutical group2025
80,000
records cleansed
−25% catalogue size
Five production sites, one point of master data control, integrations with ERP, WMS and SAP. Data prepared for the launch of a new WMS.
MDMSAP POWMSERPSAP

State-owned company2025
2 days
online webinar
10 hours of programme
Online webinar for the client's specialists: architecture and economics of a single master data system, MDM demonstration, project organisation and master data maintenance.
MDMTraining

Metals plant2025
68,000
equipment records
17,300 duplicates removed
One equipment master linked to spare parts, a maintenance methodology and data prepared for SAP PM.
SAP PMEAM

Manufacturing and trading company2025
23
consuming systems
193,000 records to centralise
Assessment of systems and data, an ontology model of master data domains, MDM adaptation requirements and cleansing scope before implementation.
MDMERPCRMDocument managementHR

Mining and metals company2024
17,000
manufacturers updated
19,000 technical documents
Update of the manufacturer master and of the technical standards and specifications.
SAP MDM

Mining and metals company2024
12,000
specifications checked
3 months for the full scope
We checked the status of every technical specification referenced in the material master against public sources and owner requests: valid, withdrawn or replaced.
Master data systemTechnical specs

National car dealer network2024
96
domains centralised
−87% master data records after cleansing
From a hundred separate databases to MDM and a group ERP: master data processes, a master data team with target SLAs, integration through middleware.
MDMGroup ERP

Pharmaceutical group2024-2025
1 month
to connect the WMS
4 months of third-line support
We connected a new WMS to MDM: adapted master data domains, approval and integration through SAP PO. Then we ran third-line support.
MDMWMSSAP PO

Oil producer2023
23,000
material records
Cleansing of the material master, templates and a data migration template for ERP.
SAP HANAMRO

Oil producer2023
30,000
MRO records
$0.5M procurement savings in 23 months
Cleansing by master data methods, criticality assessment with engineers, stock classification by consumption frequency and criticality.
SAP HANAMROABC

Mining and metals company2023
245
MRO classes
up to 5 codes per class
We reviewed the codes for each class: removed wrong and generic ones, added missing ones and kept no more than five end codes.
National codesMRO

Oil producer2022
950
templates for the catalogue
$0.9M procurement savings potential
Cleansing methodology, a three-level taxonomy and templates, new master data processes and staff training.
MRO

Mining and metals company2022
51,000
records reconciled
−27% catalogue size
Cargo, containers, locations and packaging for ports and plants: migration template, cleansing, maintenance rules in MDM.
MDM

Mining and metals company2022
19,000
software records
Processing and structuring of software lists, mandatory attributes filled.
SAP MDM

Industrial group2022-2023
SAP HANA
procurement, inventory, master data, finance and accounting in one centre
Design and automation of shared services processes: procurement, inventory, master data, finance and accounting.
SAP HANA

Mining and metals company2021
700,000
records in scope
3 assets on three continents
Master data processes for companies in Switzerland, the USA and China, cleansing of materials, services and vendors, user training.
MDM

Oilfield services company2021
12,000
records cleansed
600 duplicates confirmed
Taxonomy and templates for the whole catalogue, a new process and methodology for creating records, a tool for new items.
MRO

Mining and metals company2020
95%
answer accuracy
−17% support requests
We analysed two years of user questions and expanded the base of phrasings and answers on material and vendor master maintenance.
SAP MDG

Oil producer2020
+76%
process speed
6 experts freed from routine work
We mapped the supplier due diligence process, found the gaps, designed the target process and automated it with robots.
RPAUiPath

Gold mining company2019
−20%
excess stock
93% availability of critical stock
Processes and roles, a system with budget planning, logistics and warehouse, a central MRO catalogue and stock parameters.
InventoryProcurement

International mining company2018
4,000
duplicates found
−19% catalogue size
Duplicate merge matrix that accounts for stock, requests and orders, enrichment from manufacturer catalogues, automatic golden record choice.
MRO

Mining company moving to SAP2017
56% → 73%
service level with the same stock
One concept for procurement processes, a KPI tree, job descriptions and optimal stock parameters.
SAP
We publish news, conference talks and articles on the Synopps blog.
Projects
Tell us which systems and master data you have now and what you need. We will propose a working model and the first steps.
What you have now and what you need
Data, processes and IT landscape
Stages, timeline and scope